Section 4 (Bhanga to Jessore) Project Progress Pictures (Bhanga to Jessore) January 2021 at ch 101+535 CMP is going on Bathymetric survey of Madhumati river_ Bottom layer permeable Geotextile fabric from ch 138 325 to ch 138 375 has been completed Bridge 27 Ch. 88+156 pile id A1-1-3 concreting Bridge 60 pile id,A1-2-1 concreting Bridge #27 Working pile concreting done 01nos___ Ch 94+862-95+075 FDD test 7th Layer Done Charbokjuri mouza tree counting for estimate preparation.2021-01-14 at 8.15.37 PM Cladding layer construction is done at ch. 96 700-97 CMP Core strenth test done at 108 000 Lab. 2021-01-16 at 10.07.10 AM Concreting is going on (Bridge II-81, Pile ID P5-04) Culvert no=59 Ch.103 734 box portion base slab rebar binding ongoing 2021-01-16 at 1.01.57 PM Culvert no=63. Ch. 106 430 base slab concreting ongoing (2) Culvert no=66 Ch.107 725 base slab rebar binding ongoing. 2021-01-16 at 12.57.58 PM Cut off wall casting preparation, shutter & Rebar check, Culvert -ll-151 Ch 155 950 Embankment filling 4th layer work is done at ch 81 162-81 222 Geotextile fabric for separation and drainage 2nd layer from Ch.142 725 to 143 000 has been completed leveling layer filling after stripping works is done ch 103 000 to ch 050 M-15 cc casting cube strength test ch116 306 Done at 108 000Lab Placing top layer geotextile works is done at ch 103 925 to ch 104 000 Rebar binding & shutter fixing of pile cap at Bridge no # 89, Abutment A2, Chainage 121 647. Site visit from jajira to bhanga & HSE meeting with presence of respected Chief Safety Officer, Team leader, CREC & others.. TPA-39 static load test preparation ongoing TPA-56 Settlement founds 6.33mm under 100%working load after holding time 2hrs__ Underpass no=50 Ch.99 353 shutter check for 2 wing wall right side small portion. (2) Underpass no=50 Ch.99 353 shutter check for 2 wing wall right side small portion. Project Progress Pictures (Bhanga to Jessore) December 2020 Project Progress Pictures (Bhanga to Jessore) November 2020 PVD Work On. Going At. Ch – 135+462.5 – 135+512.5 High Strength Geotextile laying from ch 123 312 to 123 587 Embankment filling 1st layer lime line and flag marking at ch.99 012-ch.99 115 Embankment Construction from ch 133+900 to 134+291 Embankment construction & FDD test from CH. 123 137.5 to CH. 123 312.5 has been completed Core Test of CMP on going at Ch.97+900 CMP load test completed for UP#50 at Ch.99+353 CMP in progress at ch.88+900 CMP core cutting, sample no.01, Pile no. 5c at ch. 107 725 CMP at Ch. 119, 123, 126 Ch. 95+42 Underpass Wing wall base casting completed. Bridge II-03, Pile ID A2-3-3, concreting work Project Progress Pictures (Bhanga to Jessore) October 2020 Underpass no. 42, Ch. 95 424, Description of work Concrete casting of base slab wing wall Stripping at ch.99+395-99+475 Pile Casting at ch 121+520 Load Test TPA-28, At Ch-124+913.. Geotextile palacing at 99+000-99+125 FDT Test at ch 121+400 to 121+473 Embankment Construction from ch. 120+826 to120+983-1 CMP Construction at ch 124+455. Cement mixing pile (CMP) at chainage 124 437.6 to 124 472.4 Bridge no. II-79, Pile ID- P1-2-1, Ch. 116+306 Slump Bridge no. II 79, Pile ID A2.4.3, Ch. 116 306 description concreting of pile Cul off wall (Culvert Area) at ch.. 100+540 Drainage Blanket Laying at ch 124+225 – 124+437. Drainage Blanket Laying at ch 124+225 – 124+437 Drainage Blanket Laying at ch 131+025 – 131+075 Drainage Geo-textile Laying at ch 124+225 – 124+437. Drainage Geo-textile Laying at ch 124+225 – 124+437 Drainage Geo-textile Laying at ch 131+075 – 131+125 Embankment Filling at ch 120+820 – 120+ 987 Embankment filling at ch 131+100 – 131+200 Embankment filling at ch 802 ( Box culvert ) Excavation & Replacement (Culvert Area) Ch. 98+750- PVD at CH… 106+050-106+275 PVD Works at ch 122+700 – 122+900 ( partial ) Rea work Apron portion for Culvert Ch.. 99+740 (1) Removal @ Replacement Dewatering at ch 124+162 – 124+212 Project Progress Pictures (Bhanga to Jessore) December 2019