Section 4 (Bhanga to Jessore) Project Progress Pictures (Bhanga to Jessore) 2023 Project Progress Pictures (Bhanga to Jessore) 2022 Project Progress Pictures (Bhanga to Jessore) January 2021 Project Progress Pictures (Bhanga to Jessore) December 2020 Progress view A2 Abutment at 82 Bridge at CH 65+870 Progress view A2 Abutment at 82 Bridge at CH 65+870 Ch11+500-Box girder segments stock area Lifting box girder segment onto flat-bed trailer UNDERPASS # 57 Project Progress Pictures (Bhanga to Jessore) November 2020 PVD Work On. Going At. Ch – 135+462.5 – 135+512.5 High Strength Geotextile laying from ch 123 312 to 123 587 Embankment filling 1st layer lime line and flag marking at ch.99 012-ch.99 115 Embankment Construction from ch 133+900 to 134+291 Embankment construction & FDD test from CH. 123 137.5 to CH. 123 312.5 has been completed Core Test of CMP on going at Ch.97+900 CMP load test completed for UP#50 at Ch.99+353 CMP in progress at ch.88+900 CMP core cutting, sample no.01, Pile no. 5c at ch. 107 725 CMP at Ch. 119, 123, 126 Ch. 95+42 Underpass Wing wall base casting completed. Bridge II-03, Pile ID A2-3-3, concreting work Project Progress Pictures (Bhanga to Jessore) October 2020 Underpass no. 42, Ch. 95 424, Description of work Concrete casting of base slab wing wall Stripping at ch.99+395-99+475 Pile Casting at ch 121+520 Load Test TPA-28, At Ch-124+913.. Geotextile palacing at 99+000-99+125 FDT Test at ch 121+400 to 121+473 Embankment Construction from ch. 120+826 to120+983-1 CMP Construction at ch 124+455. Cement mixing pile (CMP) at chainage 124 437.6 to 124 472.4 Bridge no. II 79, Pile ID A2.4.3, Ch. 116 306 description concreting of pile Cul off wall (Culvert Area) at ch.. 100+540 Drainage Blanket Laying at ch 124+225 – 124+437. Drainage Blanket Laying at ch 124+225 – 124+437 Drainage Blanket Laying at ch 131+025 – 131+075 Drainage Geo-textile Laying at ch 124+225 – 124+437. Drainage Geo-textile Laying at ch 124+225 – 124+437 Drainage Geo-textile Laying at ch 131+075 – 131+125 Embankment Filling at ch 120+820 – 120+ 987 Embankment filling at ch 131+100 – 131+200 Embankment filling at ch 802 ( Box culvert ) Excavation & Replacement (Culvert Area) Ch. 98+750- PVD at CH… 106+050-106+275 PVD Works at ch 122+700 – 122+900 ( partial ) Rea work Apron portion for Culvert Ch.. 99+740 (1) Removal @ Replacement Dewatering at ch 124+162 – 124+212 Project Progress Pictures (Bhanga to Jessore) December 2019.