Section 1 & 2 (Dhaka to Mawa) Project Progress Pictures (Dhaka to Mawa) 2024 Project Progress Pictures (Dhaka to Mawa) 2023 Project Progress Pictures (Dhaka to Mawa) 2020 Ch11+500-Pre-casting of box girder segments Lifting box girder segment onto flat-bed trailer Ch11+500-Box girder segments stock area Ch52+200-Concreting of box girder segment Ch11+369-Drilling construction of trial pile TPA-1 Ch67+424-Steel casing driving for bored working pile Ch67+629-Rebar installation for pile cap A2 Ch42+600-Formwork assembly for construction of pier body Ch22+300-Completed piers Ch22+500-Box girder segments intended for erection Ch22+500-Lifting box girder segments into position Ch22+500-Lifting box girder segments into position P1-20191012-Ch.13+649.419-Borehole Construction P3-20191029-CH22+266.100-Placing Rebar Cage P6-20191208-CH13+315.670-Pile Underwater Concreting P10-20191005-Ch22+104.45-Static Load Test P13-20191009-Ch11+500-Fabrication of Rebar Cage P21-20191123-Ch22+380-Installation of Pile Cap Formwork P23-20191226-Ch22+304-Fabrication of Pier Formwork P24-20191123-Ch.22+342-Pier Cap Concreting P25-20191210-Ch22+304-Box Girder Erection Machine Fabrication P26-20191210-Ch22+304-Box Girder Erection Machine Fabrication P27-20191210-Ch22+304-Box Girder Segment Transportation P28-20191007-CH117+420-Batching Plant Construction P29-20191015-Ch117+420-Temporary Trestle Bridge Construction